separador.png
Search

photovoltaic project

Valenciaport awards the photovoltaic plant at the Príncipe Felipe dock in the Port of Valencia

The PAVASAL-PAVENER joint venture will be responsible for carrying out this infrastructure. The amount of the award is 3,032,469.33 euros (VAT included) The execution period for the works is ten months for construction and 50 months for maintenance. The installation will be located on a surface area of 6,420 square metres This solar park will generate 2,353 MWh/year, that is, 3% of the electrical energy consumed by the Port of Valencia This project is financed by the Next Generation funds of the European Union and the Spanish Government’s Recovery, Transformation and Resilience Plan This is the first of the photovoltaic plants which are being developed in the Valencian precinct and which will enable progress to be made in the self-supply of green energy to the Port of Valencia The installation at the Valencia Terminal Europa vehicle silo has also been put out to tender and is in the process of evaluation of the bids Between the two, 14% of the electrical energy required by the site will be produced In addition, the Port Authority of Valencia (PAV) is studying the location of a third photovoltaic plant in the Valencia area Source. Valenciaport The Port Authority of Valencia (PAV) has awarded

Leer más »